Virtual Mooring

From Pnb
Revision as of 11:00, 28 November 2011 by Eriks (talk | contribs) (Created page with '09/02/2011 - 09/12/2011 A project in conjunction with Libe Washburn and Cal Poly SLO to study wind relaxation flows in the Avila Bay area. Olly(unit_197) was deployed along wit…')
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

09/02/2011 - 09/12/2011

A project in conjunction with Libe Washburn and Cal Poly SLO to study wind relaxation flows in the Avila Bay area. Olly(unit_197) was deployed along with a glider from rutgers with an ADCP at a 50m and 100m isobath. Initial deployment hit a snag with mission-waypoint syntax but was addressed with the help of Rutgers mission 200_TN!W.mi. Both gliders were blown several kilometers off course at one point due to weather conditions.

<start:waypoints>
-12046.266 3506.303
-12046.266 3506.169
<end:waypoints>