Difference between revisions of "Database Management - David Court"
Line 22: | Line 22: | ||
<br/> | <br/> | ||
Re-organization of the BBOP database with the purpose of increasing the performance of the (in-situ) matchups<br/> | Re-organization of the BBOP database with the purpose of increasing the performance of the (in-situ) matchups<br/> | ||
− | |||
- imported all pigment measurements from SeaBASS<br/> | - imported all pigment measurements from SeaBASS<br/> | ||
- organized all radiometric data (MER, SPMR, & MicrPro)<br/> | - organized all radiometric data (MER, SPMR, & MicrPro)<br/> |
Revision as of 16:32, 21 September 2011
Summary of My Position
Current Tasks
Ongoing:
BBOP
- Processing BBOP MicroPro data
- Formatting data for SeaBASS submissions
- Latest cruise: B171
- Submitted to SeaBASS: YES
- Data available on-line: YES
Plumes & Blooms
- Formatting processed CTD for SeaBASS submissions
- Processing and formatting PRR data for SeaBASS submissions
- Latest cruise: PB231
- Submitted to SeaBASS: NO
- Data available on-line: NO
New Tasks:
Re-organization of the BBOP database with the purpose of increasing the performance of the (in-situ) matchups
- imported all pigment measurements from SeaBASS
- organized all radiometric data (MER, SPMR, & MicrPro)
- organized all absorption data (ag, ad, ap & aph)
Reasons for performing this task:
- The chlorophyll values in the original database were incorrect. The chlorophyll values were taken from the IOP bottle-files that had been submitted to SeaBASS. These were labeled as "chl_a", which is defined by SeaBASS as an HPLC product. However, these are Flourometric measurements. At some point, a script needs to be written to re-format these files and a they must then be re-submitted to SeaBASS.
- Many of the sample times are incorrect. This creates inaccuracies when trying to match-up the different measurements. Most of the problems are a result of submitting the data in local (Bermuda) time rather than GMT - as required by SeaBASS. Other issues exist as a result of the technician's computer clock being incorrectly set - sometimes by an order of years. Again, these data will ultimately have to edited and re-submitted to SeaBASS.