Difference between revisions of "PnB Cruise Notes"

From Pnb
Jump to navigation Jump to search
Line 8: Line 8:
 
-termination failure due to water ingress.  Short and blown fuse. decided to use alternative termination methods.
 
-termination failure due to water ingress.  Short and blown fuse. decided to use alternative termination methods.
  
Noticing problems with LISST data jumping on pb253, beam C has been off since pb24#
+
1/10/2014  Noticing problems with LISST data jumping on pb253, beam C has been off since pb24#  
 +
 
 +
2/6/2014 Noticed PRR 510 channel is off, and has been since pb250/pb251
 +
 
 +
2/7/2014 LISST 1284 depth offset reset +3.69m set to 0.0m in air.

Revision as of 10:34, 7 February 2014

pb252 no files recorded on DH4 for stn7 and stn4D

pb253 double cast on station D. Cast #2 is good. Cast E on PRR is bad. Roll column is not correct.

pb255 -termination failure due to water ingress. Short and blown fuse. decided to use alternative termination methods.

1/10/2014 Noticing problems with LISST data jumping on pb253, beam C has been off since pb24#

2/6/2014 Noticed PRR 510 channel is off, and has been since pb250/pb251

2/7/2014 LISST 1284 depth offset reset +3.69m set to 0.0m in air.