Difference between revisions of "PnB Cruise Notes"
Line 40: | Line 40: | ||
09/25/2014 pb263 suspected termination failure on stn 3. 120m profile. High winds. No PRR. Test uPro | 09/25/2014 pb263 suspected termination failure on stn 3. 120m profile. High winds. No PRR. Test uPro | ||
+ | |||
+ | 10/21/2014 pb264 Y cable to temp and cond. sensor damaged, replaced with IOP frame spare. New Electrical termination on CTD. |
Revision as of 14:15, 22 October 2014
pb221 -Switched to Wetlabs DH-4
pb252 -no files recorded on DH4 for stn7 and stn4D
pb253 -double cast on station D. Cast #2 is good. -Cast E on PRR is bad. Roll column is not correct.
pb255 -termination failure due to water ingress. Short and blown fuse. Decided to use alternative termination methods.
pb258 -2Amp fuse issue with CERB sys. 23 stn 4. no data collected. Fuse later replaced with correct 5A
<====================================================================>
02/??/2009 Bad HS-6 cal
09/??/2009 bad AC-9 cal
10/??/2012 AC-9 0187 Factory Service
09/24/2013 New DH4 lithium batteries.
01/10/2014 Noticing problems with LISST data jumping on pb253, beam C has been off since pb24#
02/6/2014 Noticed PRR 510 channel is off, and has been since pb250/pb251
02/7/2014 LISST 1284 depth offset reset +3.69m set to 0.0m in air.
03/2014 LISST 1284 LREF value does not match transmission.--Tau and Beam-C are off due to this. Sent into service.
04/22/2014 Alpha-Q may be producing high bubbles causing issues with ZSCAT and other Qwater standards.
09/09/2014 No Q-water zscat was performed for pb261. Used pb260. #1284 was swapped back on rosette after pb260. pb262 zscat done 9-9-2014
09/17/2014 Something strange with pb261 LISST files. Two short files and no defined "A" cast.
09/25/2014 pb263 suspected termination failure on stn 3. 120m profile. High winds. No PRR. Test uPro
10/21/2014 pb264 Y cable to temp and cond. sensor damaged, replaced with IOP frame spare. New Electrical termination on CTD.