Difference between revisions of "PnB Cruise Notes"
Jump to navigation
Jump to search
Line 8: | Line 8: | ||
-termination failure due to water ingress. Short and blown fuse. decided to use alternative termination methods. | -termination failure due to water ingress. Short and blown fuse. decided to use alternative termination methods. | ||
− | Noticing problems with LISST data jumping on pb253, beam C has been off since pb24# | + | 1/10/2014 Noticing problems with LISST data jumping on pb253, beam C has been off since pb24# |
+ | |||
+ | 2/6/2014 Noticed PRR 510 channel is off, and has been since pb250/pb251 | ||
+ | |||
+ | 2/7/2014 LISST 1284 depth offset reset +3.69m set to 0.0m in air. |
Revision as of 10:34, 7 February 2014
pb252 no files recorded on DH4 for stn7 and stn4D
pb253 double cast on station D. Cast #2 is good. Cast E on PRR is bad. Roll column is not correct.
pb255 -termination failure due to water ingress. Short and blown fuse. decided to use alternative termination methods.
1/10/2014 Noticing problems with LISST data jumping on pb253, beam C has been off since pb24#
2/6/2014 Noticed PRR 510 channel is off, and has been since pb250/pb251
2/7/2014 LISST 1284 depth offset reset +3.69m set to 0.0m in air.