Difference between revisions of "Calibration process procedures"

From Pnb
Jump to navigation Jump to search
Line 24: Line 24:
  
 
After processing, it is good to compare the latest calibration processed values with previous ones.  For this, data from the _ave.txt files(which should be linked by you from the .txt files in the year/date folder) is added to the qcal_a_yy_yy.txt and qcal_c_yy_yy.txt files.  ac9cal.m is restarted and the qcal file is now the *yy_yy.txt folder.  Hit the last button ts_cal to view the whole time series.
 
After processing, it is good to compare the latest calibration processed values with previous ones.  For this, data from the _ave.txt files(which should be linked by you from the .txt files in the year/date folder) is added to the qcal_a_yy_yy.txt and qcal_c_yy_yy.txt files.  ac9cal.m is restarted and the qcal file is now the *yy_yy.txt folder.  Hit the last button ts_cal to view the whole time series.
 +
 +
 +
 +
[[File:achannel_cal_AC9.png]]
 +
 +
  
  

Revision as of 14:25, 6 May 2015

After calibration processing of calibration files

AC-9

As of October 2012, AC-9 calibrations have been reprocessed with new 'Sit' values from Wetlabs AC meter protocol document, rev.Q. The processing directory for AC9 calibrations is /pb/AC9/cals/ instrument number(184) /QWATER/ year/date folder.

Each time the instrument is sent back for a factory calibration, the new disc should be checked for updated temp and sal correction coefficients and calibration history should be updated in the ac9cal.txt inside of the /cals/0184/DeviceFiles/ directory. Note that if coefficients have changed, goac9.par will need to be updated in the fallowing cruise processing.

To process the calibration files, the device number _watertemp.txt file must be updated with the latest temperature value and .dat files must be present in the folder you wish to process in. ac9cal.m sources ac9cal_def.par in the AC9/cals/LIST folder. This should be updated when new 'Sit' are created.


Directory update 6-25-2014

Calibration directories have been updated AC9 example ==> /home/oceancolor/CALIBRATION/Wetlabs/AC-9/UCSB_Calibrations/AC-9_SN0184/2014/140109/

For above example, qcal.txt will need to look in /home/oceancolor/CALIBRATION/Wetlabs/AC-9/UCSB_Calibrations/AC-9_SN0184/2014/140109/X_Calproc/

To process the cals for PnB AC9 proc, make folder X_Calproc in same directory and copy/paste cal files to keep originals.


Reviewing calibrations

After processing, it is good to compare the latest calibration processed values with previous ones. For this, data from the _ave.txt files(which should be linked by you from the .txt files in the year/date folder) is added to the qcal_a_yy_yy.txt and qcal_c_yy_yy.txt files. ac9cal.m is restarted and the qcal file is now the *yy_yy.txt folder. Hit the last button ts_cal to view the whole time series.


Achannel cal AC9.png



HS-6


back to Main Page