PnB Cruise Notes

From Pnb
Revision as of 14:43, 2 January 2014 by Eriks (talk | contribs)
Jump to navigation Jump to search

pb253 double cast on station D. Cast #2 is good.

pb255 -termination failure due to water ingress. Short and blown fuse. decided to use alternative termination methods.