PnB Cruise Notes

From Pnb
Revision as of 17:10, 8 January 2014 by Eriks (talk | contribs)
Jump to navigation Jump to search

pb252 no files recorded on DH4 for stn7 and stn4D

pb253 double cast on station D. Cast #2 is good.

pb255 -termination failure due to water ingress. Short and blown fuse. decided to use alternative termination methods.